Plumbing

Redid water setup for the house. Ran new 3/4 supply to new copper manifolds that I put together. The manifolds are 1in with 4 – 1/2in lines and 1 – 3/4 line.

Waste lines had crumbled apart, so I replaced and reolacted. This is the hallway bath sink with the new waste line and vent.
All kitchen sewer/water is new.

After relocating sewer and water lines refridgerator can slide back additional 6 inches making it less conspicuous.

New Exterior Windows and Doors

Installed two new Marvin windows for the master. I was trying to decide between Marvin and Pella, but found Marvin to have a better crank design.

Here’s a more recent shot of the door from the garage, the new garbage area with the poured concrete. You’ll notice, I also decided to take the old wall air conditioner and use it for the garage.