Had Superior blow cellulose fiber insulation into the ceiling and then got Urethane for a couple of the furred out walls. The insulation makes a big difference in comfort. I also had them blow the cellulose in for sound deadening between rooms.
Redid water setup for the house. Ran new 3/4 supply to new copper manifolds that I put together. The manifolds are 1in with 4 – 1/2in lines and 1 – 3/4 line.
Waste lines had crumbled apart, so I replaced and reolacted. This is the hallway bath sink with the new waste line and vent.All kitchen sewer/water is new.
After relocating sewer and water lines refridgerator can slide back additional 6 inches making it less conspicuous.
Installed two new Marvin windows for the master. I was trying to decide between Marvin and Pella, but found Marvin to have a better crank design.
Here’s a more recent shot of the door from the garage, the new garbage area with the poured concrete. You’ll notice, I also decided to take the old wall air conditioner and use it for the garage.
One- Figure out a good place for the future AC compressor unit. Two- Run the lineset out to that location. Three-Craft a new return air that would draw from the hallway Four-Place return air vents in each bedroom Five- clean out the existing plenum. Six- create a new register outlet for the new mudroom area.
Here’s the finished return air duct that draws from the hallway – Pictures are taken a little post facto
Electrical was much more time consuming than I would have imagined. I had a lot more fishing through masonry than I initially imagined. It worked out pretty well though, most voids in the CMU were possible to maneuver through.
The data cables for the house were also a larger burden than anticipated because of the 4 coax lines I ran to each location and also all the cat 5, cat 6, speaker, control wiring, and security wiring.
Here a picture of the wires for my media cabinet in the living room.
The Junction Box to handle all the wiring in the CMU.The outdoor outlets covers I chose. Also seen is the PVC pipe that contains the sprinkler wire, I changed the location so the controller could be inside in a storage closetHere’s the switches and controller box for the kitchen and back patio.Added switches and outlets to the hallway bath where there had been none.
Whether to use steel or wood studs (probably should have used steel for the areas furred out)
Ceiling heights -I could have taken the ceiling higher in both the hallway and bath, but felt that choosing a height that was a little lower than the high points in the bedrooms was the best.
How to get a look where no baseboard would be used – I considered drywall options and went with a something I came up with where I notched studs and then ran backer in the notch to facilitate a stronger base.
I also settled on a design for the media center…You can see the closets. The kids room is designed so that if we go through with the master suite design. I can open another closet in their room relatively easy.
The home was featured in Better Homes and Gardens, which was a bit of a shock to us. The fellow who originally built the home dropped by and was delighted that somebody was trying to rehabilitate the home.
He told us a story about the original planning process and how it had been difficult to obtain permits because of the “radical” design. It really was quite interesting to see all the articles and such that he had kept over the years.
The original builder had said that a man had shown up from Better Homes and Gardens to look at a potential home in the area, but was also keeping an eye out for anything else. The original builder suggested he look at his, and he said the moment the the man from BH&G pulled up, he said, this is it!
So they flew in a photographer and staged the home for the magazine.
Apparently, because of the magazine publication, he sold the same plan to people around the world, so if you’ve seen this before, there you go.
He gave us copies of everything. So now, for your delight, the home before years of renters and do-it-yourselfers got to it.
Fun Stuff. A couple things to note, the master bedroom had windows just like the rest of the house. and the appliance arrangement is different, but the cabinetry the same.
Demo has revealed quite a bit and in any case, my project has increased in scope quite a bit. The general plan is the same but what is included is what has changed. I was unsure about the ceiling(gone), unsure about all the electrical (gone), unsure about the insulation (gone) unsure about plumbing (gone, everything except the stack and underground). The following are explanations.
A good reason why a lot of the switches don’t work is the wires either don’t go anywhere or go to J-boxes that are hidden and the connections inside are broken. What do I expect, the connections inside were taped together, not twisted, crimped or anything else. Found two more places where there had been a smoldering fire at some point around these hidden J boxes… holy cow.
Insulation: apart from the insulation in the accessible areas, which looked fine, everything else is done with 4 inch batt- Insulation value maybe R-5 or 6 since it’s old compacted and deteriorated.
The plumbing was a known issue, but how much was something else, I started to remove a branch waste line and everything attached to it fell apart. Also, I found out why the previous owner ran the water lines inside below the ceiling line. He had run the waterlines outside in the eaves and had covered them up with aluminum siding. The neighbor…other side neighbor told us that over the winter, the pipes had burst and sprayed water everywhere.
I’m on my 5th dumpster, this has been the regular site for the last while, I just wonder when I can say enough and end demo.
Cut the concrete for the new drain lines for the utility room and laundry room, Cut the concrete for the gas line to the range, cut the new window openings, the new door to the garage, the new door from the garage, the fireplace details, and for good measure the driveway.
Everything went pretty smoothly. The saw cut through the concrete well enough. The windows and doors were a pain because the saw was about 30 lbs, then add a hose attached with water spraying everywhere and the gyroscopic action from the blade spinning. I wet cut one side, then dry cut the other.
By the way, did I mention that under all the carpet were old abestos tiles, hello abatement.There was some good news, After revealing the ceiling, I found that they had used a wood tongue and groove system for the roof paneling throughout the home. I’m not a big fan that it is placed diagonally, but exposing the ceiling is definitely something worth thinking about. Also, I had speculated that the ceiling in the bedrooms could be raised and I was right. I will be removing all wood framing now to expose the ceiling and allow for the new walls.