Small Built-ins

This box is for the media center. The box is L shaped to allow easy access to he components connections. Also, I put in plywood backing to mount TVs.

Art Niche in the Hallway with Electrical for lighting and art niche above the hallway.

Insulation

Had Superior blow cellulose fiber insulation into the ceiling and then got Urethane for a couple of the furred out walls. The insulation makes a big difference in comfort. I also had them blow the cellulose in for sound deadening between rooms.

Plumbing

Redid water setup for the house. Ran new 3/4 supply to new copper manifolds that I put together. The manifolds are 1in with 4 – 1/2in lines and 1 – 3/4 line.

Waste lines had crumbled apart, so I replaced and reolacted. This is the hallway bath sink with the new waste line and vent.
All kitchen sewer/water is new.

After relocating sewer and water lines refridgerator can slide back additional 6 inches making it less conspicuous.

New Exterior Windows and Doors

Installed two new Marvin windows for the master. I was trying to decide between Marvin and Pella, but found Marvin to have a better crank design.

Here’s a more recent shot of the door from the garage, the new garbage area with the poured concrete. You’ll notice, I also decided to take the old wall air conditioner and use it for the garage.

HVAC

HVAC to do list…

One- Figure out a good place for the future AC compressor unit.
Two- Run the lineset out to that location.
Three-Craft a new return air that would draw from the hallway
Four-Place return air vents in each bedroom
Five- clean out the existing plenum.
Six- create a new register outlet for the new mudroom area.

Here’s the finished return air duct that draws from the hallway – Pictures are taken a little post facto