Cedar HouseConstruction

Framing

A few considerations I had during framing were

Whether to use steel or wood studs (probably should have used steel for the areas furred out)

Ceiling heights -I could have taken the ceiling higher in both the hallway and bath, but felt that choosing a height that was a little lower than the high points in the bedrooms was the best.

How to get a look where no baseboard would be used – I considered drywall options and went with a something I came up with where I notched studs and then ran backer in the notch to facilitate a stronger base.

I also settled on a design for the media center…
You can see the closets. The kids room is designed so that if we go through with the master suite design. I can open another closet in their room relatively easy.

Leave a Reply

Your email address will not be published. Required fields are marked *